beautypg.com

100k-2gsr spin manifold assembly – Hawk Industries Hawkjaw Sr. Manual 100K-2GSR Serial Numbers 101 to 120 User Manual

Page 105

background image

100K-2GSR Spin Manifold Assembly

Drawings 105

ITEM QTY.

PART NO./DESC

PORT/DESC.

HOSE DESTINATION

1

1

H38 Spin Manifold

2

1

H35 Sequence Valve

V2

3

1

H34 Check Valve

V4

4

1

H31 Flow Control Valve

V7

5

2

H33 Check Valve

V3,V8

6

1

H36 Pressure Reducing Valve

V1

7

1

H45 Needle Check Valve

V9

8

2

2062-8-8S_8MORB x 8MJIC Fitting 90

9

1

206209-6-6S_8MORB x 8MJIC Fitting 90 Ext.

10

1

2216-4-6S_-6MORB x-4FNPT Str. Adaptor

11

1

2081-4-2S 1.4 x 1.8 H.P. Hex Bushing

12

1

2254-2-2S_2MNPT x 2FNPT_T Fitting Swivel

13

1

2216-2-4S_-4MORB x-4FNPT Str. Adaptor

14

1

2047-2-2S 2MNPTX2FNPT Fitting 90 Drg Swivel

15

4

202702-8-8S_-8MORB x -8MJIC Str. Adaptor

16

1

HOS-10_-8FJICx-8FJICx33.00lg. Hose

PCR-Spin Manifold

Rod-Push Cyl.

17

1

HOS-8_-8FJICx-8FJICx49.00lg. Hose

SR-Spin Manifold

Rod-Spinmaster

18

1

HOS-7_-8FJICx-8FJICx49.00lg. Hose

SP-Spin Manifold

Piston-Spinmaster

19

1

HOS-9_-8FJICx-8FJICx24.00lg. Hose

PCP-Spin Manifold

Piston-Push Cyl.

20

1

HOS-32_1.8MNPTx1.8MNPTx17lg_1.8 Hose

RT-Spin Manifold

Winch Motor Drain

21

1

JHOS-OIL 1.8MNPTx1.8MNPTx83lg_1.8 Hose

RT1

Torque Cylinder

22

1

HOS-18_1.8MNPTx1.8MNPTx54lg_1.8 Hose

RT1

Torque Cntrl. Blk, RT

NOTE

To adjust the Spinner move forward, close and open sequence:

1. Use a 5/32" allen wrench to rotate the Push cylinder pressure reducing valve at Port V1 counterclockwise until

refusal.

2. Use a 5/32" allen wrench to rotate the Spinner Door sequence valve at Port V2 clockwise until refusal.
3. Starting with the needle valve at Port V9 full open (turned counterclockwise until refusal), use a 1/4" allen wrench to

rotate the Spinner retract needle valve at Port V9 clockwise until the spinner doors open fully. Then rotate the valve
in the same direction another 1/2 turn, then lock the valve.

4. Use a 5/32" allen wrench to rotate the Spinner motor sequence valve at Port MSEQ on the main hydraulic block

clockwise until refusal.

5. Set the Selector switch to Break. Adjust the spinner to the drill pipe tube OD. Place the HawkJaw on the drill pipe

connection.

6. Press the Grip Hold button. Press the Spin button. Rotate the Push cylinder pressure reducing valve at Port V1

clockwise until the spinner moves forward and the chain touches the pipe. If the chain forces the HawkJaw away
from
the pipe, back off on the adjustment until the spinner chain touches the pipe without forcing the Hawkjaw back.
The spinner will close if you hold the spin button too long.

7. Rotate the Spinner Door sequence valve at Port V2 counterclockwise until the spinner doors begin to close as the

spinner chain touches the pipe. For each adjustment, press and hold the Spin button to test the adjustment.
Continue to rotate the adjustment counterclockwise until the spinner begins to close before the chain touches the
pipe. Rotate the adjustment clockwise until the spinner begins to close as the spinner chain touches the pipe.
Lock in the adjustment.

8. For each adjustment, press and hold the Spin button until the spinner doors close. Release the Spin button to test

the adjustment. If the rollers grab the pipe while retracting, adjust the needle valve clockwise. If the chain forces
the HawkJaw backwards while retracting, adjust the needle valve counterclockwise.

9. Adjust the spinner motor sequence valve at Port MSEQ. Use a 3/16" allen wrench to rotate the sequence valve

counterclockwise until the chain moves before the doors close. Next, rotate the adjustment clockwise until the
spinner doors close before the chain moves. Rotate one half-turn clockwise. Lock in the adjustment.