HP 2100 ER User Manual
Page 32

2-8
Chapter 2
Setting Up the Fibre Bridge
Installing Cables
Fibre Bridge Connection, Expanded
Configuration Example (DLT Libraries Only)
1. Properly shut down all peripheral devices that will be connected to
the Fibre Bridge, including the hub(s). Check with the system
administrator before turning off power to either hubs or libraries.
CAUTION
Failure to turn off all power could result in damage to the devices.
2. Connect a SCSI cable from bus 1 on the Fibre Bridge to bus 1 on the
library one. For a two-drive library, connect a SCSI cable from bus 2
on the Fibre Bridge to bus 2 on the library.
3. Connect the optical cable from the Fibre Bridge to the hub.
4. Connect an optical cable from the hub to each host system.
If you have a 6-8 host system, you will need an additional hub. (See
Figure 2-3 and Figure 2-4 for examples of expanded configurations.)
5. Connect the power cord from Fibre Bridge one to an grounded outlet.
6. Confirm that all cable ends are connected securely and both ends of
each SCSI bus are properly terminated, as shown in Figure 2-4 or
Figure 2-5 on page 2-10.
7. See poweron instructions in Chapter 3.
- Surestore 2.20 Tape Library Surestore DLT 4000 15 Tape Library Surestore 1.8 Tape Library Surestore DLT 718 Tape Autoloader Surestore DLT 818 Tape Autoloader Surestore DLT 7000 28.48 Tape Library Surestore 2.28 Tape Library Surestore E 4.40 Tape Library Surestore E 6.60 Tape Library Surestore DLT 418 Tape Autoloader Surestore DLT 7000 15 Tape Library Surestore E 2.20 Tape Library Surestore 4.40 Tape Library Surestore 6.60 Tape Library Surestore 10.588 Tape Library Surestore 2.15 Tape Library Surestore 3.30 Tape Library Surestore 6.100 Tape Library Surestore SCSI-FC Bridges Surestore DLT 4000 28.48 Tape Library