Chapter 2

2-7

Setting Up the Fibre Bridge

Installing Cables

S

e

tti

ng Up

th

e

F

ibr

e B

ridg
e

3. Connect one end of the optical cable into the GBIC on the Fibre

Bridge and the other end into the GBIC on the Fibre Channel HBA in
the host.

4. Connect the power cord from the Fibre Bridge to an grounded outlet.

5. Confirm that all cable ends are connected securely and both ends of

the SCSI bus are properly terminated, as shown in Figure 2-3 on page
2-7.

6. Go to “Powering on the System” in Chapter 3.

Figure 2-3

Fibre Bridge Connection, Basic Configuration
(DLT and MO Libraries)