Dlt and mo libraries) -7 – HP 2100 ER User Manual
Page 31
Chapter 2
2-7
Setting Up the Fibre Bridge
Installing Cables
S
e
tti
ng Up
th
e
F
ibr
e B
ridg
e
3. Connect one end of the optical cable into the GBIC on the Fibre
Bridge and the other end into the GBIC on the Fibre Channel HBA in
the host.
4. Connect the power cord from the Fibre Bridge to an grounded outlet.
5. Confirm that all cable ends are connected securely and both ends of
the SCSI bus are properly terminated, as shown in Figure 2-3 on page
2-7.
6. Go to “Powering on the System” in Chapter 3.
Figure 2-3
Fibre Bridge Connection, Basic Configuration
(DLT and MO Libraries)
This manual is related to the following products:
- Surestore 2.20 Tape Library Surestore DLT 4000 15 Tape Library Surestore 1.8 Tape Library Surestore DLT 718 Tape Autoloader Surestore DLT 818 Tape Autoloader Surestore DLT 7000 28.48 Tape Library Surestore 2.28 Tape Library Surestore E 4.40 Tape Library Surestore E 6.60 Tape Library Surestore DLT 418 Tape Autoloader Surestore DLT 7000 15 Tape Library Surestore E 2.20 Tape Library Surestore 4.40 Tape Library Surestore 6.60 Tape Library Surestore 10.588 Tape Library Surestore 2.15 Tape Library Surestore 3.30 Tape Library Surestore 6.100 Tape Library Surestore SCSI-FC Bridges Surestore DLT 4000 28.48 Tape Library