MCZ PowerBox COMPACT User Manual
Page 18

Chapter 3
INSTALLATION AND USE MANUAL
page
18
Installation and fitting
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
It is mandatory to shorten the connecting tube in
accordance with its position (side or front) in a way
that results in the tube being firmly extended. This
operation is necessary to facilitate pellet descent.
Before assembling the cladding, execute a test by
loading the combustible fuel to make sure that the
pellets descend correctly towards the hopper.
It is mandatory to provide for correct insulation of the
tube if it is mounted on the left side near the smoke
exhaust.
MCZ declines any responsibility in case of non-
observance of the aforementioned warnings. Fire risk!
3.5.1.
Side installation of chute
In case the chute is positioned on the side, the distance from the axis
of the machine to the wall must be at the most 80 cm (see figure).
To position the chute, proceed as follows:
• Connect the provided tube to the Powerbox, being careful that
the tube is turned to the side, and attach it with the strap.
• Connect the tube (in the upper part) to the hole in the door
using the provided strap.
• Position the tube with the door frame in a way that it will be
possible to screw it in and mount it to the cladding near the
hole once the cladding is in place.
• To assemble the exterior door, refer to paragraph 3.15, since
this operation must be executed once the cladding is in place.
3.5.2.
Front installation of chute
• Connect the provided tube, being careful that the tube is
turned forward, and attach it with the strap.
• Connect the tube to the hole in the door using the strap.
• Position the tube in a way that renders it accessible once the
cladding is in place and that allows mounting the door structure
to the cladding.
• To assemble the exterior door, refer to paragraph 3.15, since
this operation must be executed once the cladding is in place.
Installation of side chute
Installation of the front chute