A.2 motion command status – Yaskawa MP900 Teach Pendant User Manual
Page 71
A.2 Motion Command Status
A -3
A.2 Motion Command Status
Table A.2. Motion Command Status
Name
# Register
Details
Motion
Command
IW jj 15
Flags indicating the execution status of motion commands.
Command
Status
b0: BUSY
Command Executing
The motion command is being executed and new motion commands cannot
be issued.
b1: HOLDL
Command Hold Completed
Turns ON when a motion command hold has been requested by setup param-
eter OWjj21, b0: Command Hold, and that hold is completed.
b2: DEN
Distribution Completed
The distribution completed status of the MECHATROLINK Servo has been
stored.
b3: ZSET
Zero Point Completed
Turns ON when motion command ZSET has finished executing.
b4: EX_LATCH
External Positioning Signal Latch Completed
Turns ON when the latch is completed by the external signal, while motion
command EX_POJING/LATCH is being executed.
b:5 FAIL
Command Ended in an Error
Turns ON when an error occurs during motion command processing.
b:6 ZRNC
Zero Point Return Completed
ON when a zero point return operation has been completed.
b7 to b15:
Not used.
A
- Tag Generator (30 pages)
- MP3300iec (82 pages)
- 1000 Hz High Frequency (18 pages)
- 1000 Series (7 pages)
- PS-A10LB (39 pages)
- iQpump Micro User Manual (300 pages)
- 1000 Series Drive Option - Digital Input (30 pages)
- 1000 Series Drive Option - CANopen (39 pages)
- 1000 Series Drive Option - Analog Monitor (27 pages)
- 1000 Series Drive Option - CANopen Technical Manual (37 pages)
- 1000 Series Drive Option - CC-Link (38 pages)
- 1000 Series Drive Option - CC-Link Technical Manual (36 pages)
- 1000 Series Drive Option - DeviceNet (37 pages)
- 1000 Series Drive Option - DeviceNet Technical Manual (81 pages)
- 1000 Series Drive Option - MECHATROLINK-II (32 pages)
- 1000 Series Drive Option - Digital Output (31 pages)
- 1000 Series Drive Option - MECHATROLINK-II Technical Manual (41 pages)
- 1000 Series Drive Option - Profibus-DP (35 pages)
- AC Drive 1000-Series Option PG-RT3 Motor (36 pages)
- Z1000U HVAC MATRIX Drive Quick Start (378 pages)
- 1000 Series Operator Mounting Kit NEMA Type 4X (20 pages)
- 1000 Series Drive Option - Profibus-DP Technical Manual (44 pages)
- CopyUnitManager (38 pages)
- 1000 Series Option - JVOP-182 Remote LED (58 pages)
- 1000 Series Option - PG-X3 Line Driver (31 pages)
- SI-EN3 Technical Manual (68 pages)
- JVOP-181 (22 pages)
- JVOP-181 USB Copy Unit (2 pages)
- SI-EN3 (54 pages)
- SI-ET3 (49 pages)
- MECHATROLINK-III (35 pages)
- EtherNet/IP (50 pages)
- SI-EM3 (51 pages)
- 1000-Series Option PG-E3 Motor Encoder Feedback (33 pages)
- 1000-Series Option SI-EP3 PROFINET (56 pages)
- PROFINET (62 pages)
- AC Drive 1000-Series Option PG-RT3 Motor (45 pages)
- SI-EP3 PROFINET Technical Manual (53 pages)
- A1000 Drive Option - BACnet MS/TP (48 pages)
- 120 Series I/O Modules (308 pages)
- A1000 12-Pulse (92 pages)
- A1000 Drive Software Technical Manual (16 pages)
- A1000 Quick Start (2 pages)
- JUNMA Series AC SERVOMOTOR (1 page)
- A1000 Option DI-101 120 Vac Digital Input Option (24 pages)