SMA STP 15000TL Installation User Manual
Page 25

SMA Solar Technology AG
Mounting
Installation Manual
STP20TLHE-IA-IEN122222
25
7. Screw the supplied eye bolt into the drill hole
provided in order to secure the enclosure against
removal. Only tighten the eye bolt hand-tight.
8. In order to secure the enclosure to the back panel,
fasten the underside of the enclosure with the two
M5x10 cheese-head screws supplied
(torque: 6.0 Nm).
9. Check to ensure that the inverter is securely in place.
☑ The inverter is now securely mounted to the wall.
If the inverter is not to be connected immediately, re-attach the lower enclosure lid:
– Dock the lower enclosure lid at an angle and
attach. The captive screws must protrude.
– Pre-screw all six screws and then tighten them in
the sequence shown on the right
(torque: 2.0 Nm).