beautypg.com

3 errors during registration in sunny portal, Hooting (see section 9.3 "errors – SMA SUNNY HOME MANAGER Installation User Manual

Page 56

background image

9  Troubleshooting

SMA Solar Technology AG

56

HoMan-IA-en-17

Installation Manual

9.3 Errors during Registration in Sunny Portal

Off

There is no BLUETOOTH connection between the SMA radio-controlled
socket and the Sunny Home Manager.

Corrective measures:

• Ensure that the Sunny Home Manager is supplied with voltage

(see Section 7.6).

• Ensure that the same NetID is configured on the

SMA radio-controlled socket and the Sunny Home Manager
(see Section 5.1.3, page 29).

• If possible, select a different mounting location.
• If no other mounting location is possible, use an

SMA BLUETOOTH Repeater or an additional SMA radio-controlled
socket. This will extend the wireless range of your BLUETOOTH
network.

Problem

Cause and corrective measures

The PV System Setup Assistant
cannot establish a connection
to the Sunny Home Manager.

It is possible that the Sunny Home Manager is not correctly
connected to the router.

or
It is possible that the Sunny Home Manager does not have
voltage supply. In this case, all LEDs on the
Sunny Home Manager will be off.

Corrective measures:

• Ensure that the Sunny Home Manager is correctly

connected to the router (see Section 7.4).

• Ensure that the Sunny Home Manager is supplied with

voltage (see Section 7.6, page 42).

• Contact the SMA Service Line if the Sunny Home Manager

is correctly connected to the router and is supplied with
voltage but all LEDs remain off.

The PV System Setup Assistant
lists none or not all of the
BLUETOOTH devices in your PV
system.

The NetID of the PV system may not be configured on certain
devices.

Corrective measures:

• Ensure that the NetID of the system is set on all devices.

LED status

Cause and corrective measures