beautypg.com

5 restarting the sc-com – SMA SC-COM User Manual

Page 23

background image

SMA Solar Technology AG

6  Setting the SC-COM

Operating Manual

SC-COM-BE-en-20

23

Procedure:

1. Log into the user interface as an installer.
2. Select Sunny Central > Info.
3. Select [Default setting].

☑ A window containing a security prompt opens.

4. Select the button [Confirm].

6.2.5 Restarting the SC-COM

In the event of disturbances in communication with the devices connected to the Sunny Central, you can restart the

SC-COM.

Procedure:

1. Log into the user interface as an installer.
2. Select Sunny Central > Info.
3. Select [Stop system].

☑ A security prompt appears.

4. Select the button [Confirm].

☑ The SC-COM is restarted.

Plant identifier in Sunny Portal
If you reset all the SC-COM settings, the SC-COM will delete all login settings for Sunny Portal. If you restart the

SC-COM after reset without changing any settings, the SC-COM will create a new plant with a new plant identifier

in Sunny Portal.

• If the SC-COM is configured to send data to the existing PV plant in Sunny Portal, adjust the identifier of the

existing PV plant (see Section 7.3.2 "Adjusting the Plant Identifier for Sunny Portal", page 27).

• Enter the e-mail address of a user who has administrator rights for the plant in Sunny Portal.