5 restarting the sc-com – SMA SC-COM User Manual
Page 23

SMA Solar Technology AG
6 Setting the SC-COM
Operating Manual
SC-COM-BE-en-20
23
Procedure:
1. Log into the user interface as an installer.
2. Select Sunny Central > Info.
3. Select [Default setting].
☑ A window containing a security prompt opens.
4. Select the button [Confirm].
6.2.5 Restarting the SC-COM
In the event of disturbances in communication with the devices connected to the Sunny Central, you can restart the
SC-COM.
Procedure:
1. Log into the user interface as an installer.
2. Select Sunny Central > Info.
3. Select [Stop system].
☑ A security prompt appears.
4. Select the button [Confirm].
☑ The SC-COM is restarted.
Plant identifier in Sunny Portal
If you reset all the SC-COM settings, the SC-COM will delete all login settings for Sunny Portal. If you restart the
SC-COM after reset without changing any settings, the SC-COM will create a new plant with a new plant identifier
in Sunny Portal.
• If the SC-COM is configured to send data to the existing PV plant in Sunny Portal, adjust the identifier of the
existing PV plant (see Section 7.3.2 "Adjusting the Plant Identifier for Sunny Portal", page 27).
• Enter the e-mail address of a user who has administrator rights for the plant in Sunny Portal.