Testing – Gasboy CFN Islander II User Manual
Page 80

03/07/03
5-1
Section 5
TESTING
COMPLETION CHECKLIST
The information below should be reviewed to help verify proper installation of the Islander prior to
testing the pumps and/or remote dispensers in the manual override position.
1.
Are the CFN system components located in the proper environment as described throughout
Section 2?
2.
Is there adequate clearance around the Islander. (See Section 2, Islander)?
3.
Is all the wiring in metal conduit except as noted in the Short Haul Modem section?
4.
Is the AC and DC wiring in separate conduits, troughs, etc.? If not, and AC and DC wires
share conduit, shielded cable must be used as specified in Section 3 Communication
Requirements, RS-485, Short Haul Modem - RS-422, or Section 4, Pulser Wiring and
Configuration.
5.
Are the CFN system components on a separate dedicated breaker (see Section 3)?
6.
Are the CFN system components grounded properly (see Section 3)?
7. Are pumps over 3/4 HP at 120/240 VAC or 1-1/2 HP at 240 VAC equipped with a starter
relay (Section 4)?
8.
Is the correct gauge wire installed for the:
•
system (Section 3)?
•
pumps (Section 4)?
•
remote dispensers (Section 4)?
•
pulsers (Section 4)?
•
short haul modem (Section 3)?
9.
Are the communication lines under the maximum allowable distance:
•
RS-485 1000/1500 feet (Section 3)
•
RS-422 (short haul modem) 1500 feet (Section 3)?
•
RS-232 100 feet (Section 3)?
10. If the system has a modem, is the phone line installed (See Phone Modems, Section 3)?
11. Is there fuel in the tanks?