beautypg.com

1 energizing the lbc-4000, 2 conv a and conv b led indicators – Comtech EF Data LBC-4000 User Manual

Page 58

background image

LBC-4000 L-Band Up/Down Converter System

Revision 4

Front Panel Operation

MN/LBC4000.IOM

5–2

5.1.1 Energizing the LBC-4000

Chapter 2. INSTALLATION

Chapter 3. REAR PANELCONNECTIONS

 

The prime power switch is mounted behind the front panel. To access the 
switch,  loosen  the  three  front  panel  thumb  screws,  slide  the  front  panel 
out from the chassis, and then drop down the panel.  

 

Prior to turning on power to the unit, check to ensure that installation is 
complete, and verify that the LBC‐4000 is connected to the proper prime 
power source, RF Input, and RF Output.  

 

Switch on the unit and verify that the cooling fan is operational, the LED 
indicators  illuminate  as  expected,  and  the  Vacuum  Fluorescent  Display  is 
readable.  

5.1.2 CONV A and CONV B LED Indicators

The operational state of the LBC‐4000 is represented by two sets  
of five front panel LED indicators – one set each for – CONV A and 
CONV B

 
 
 
The function of the LEDs is as follows: 
 

LED

STATE

WHEN LIT, THE DESIGNATED SIDE...

SUM FAULT

Red

...has active faults.

MUTE

Amber

...is in Mute Mode.

ONLINE

Green

...is operational.

UP

Green

...is operating as an Up Converter.

DOWN

Green

...is operating as a Down Converter.