3 connecting the prime power, 4 connecting external cables, 5 removing or installing converter modules – Comtech EF Data LBC-4000 User Manual
Page 33
LBC-4000 L-Band Up/Down Converter System
Revision 4
Installation
MN-LBC4000A
2–7
2.3
Connecting the Prime Power
A power cord for connection to 90‐to‐125VAC or 205‐to‐240VAC power sources is provided with
the LBC‐4000. This detachable power cord mates with the AC Prime Power receptacle on the
LBC‐4000 rear panel.
2.4
Connecting External Cables
Proceed to connect all external cables to the LBC‐4000 rear panel connectors as outlined in
Chapter 3. REAR PANEL CONNECTORS. Should difficulties occur, call Comtech EF Data Customer
Support for assistance.
2.5
Removing or Installing Converter Modules
The LBC‐4000 comes preassembled as ordered for the specific customer application. In the
event removal or replacement of the up/downconverter modules is required, complete
instructions are provided in Appendix A. UP/DOWNCONVERTER IDU MODULE REMOVAL/RE‐
INSTALLATION.