beautypg.com

4 outputs, Outputs – Pilz PSSu K F FCU User Manual

Page 13

background image

Function description

Operating Manual PSSu K F FCU
1002391-EN-04

13

Outputs

}

2 dual-pole digital outputs (cannot be used as a single-pole output)

NOTICE
Risk from high discharge voltage!
The discharge voltage when switching off an inductive load is up to -185 V.
The connected load can be damaged by the discharge voltage.

– Limit the discharge voltage if the connected load can be damaged by

this discharge voltage.

}

2 single-pole digital outputs

}

The max. capacity at an output depends on the load (see characteristic). Connecting a

higher capacity may lead to an error.

Open circuit detection (only on dual-pole outputs):

}

The module will detect an open circuit between outputs O0x+ and O0x-.

}

The result of open circuit detection is signalled as an output error.

}

Loads over 0,17 kOhm may mistakenly be detected as an open circuit.

Output test

}

Outputs that are switched on are checked via regular off tests.

– Test pulses for outputs that are switched on: see

Technical details [

36]

– Outputs that are switched on are switched off for the duration of the test pulse.
– The load must not switch off because of the test.

}

Outputs that are switched off are checked via regular on tests (only on single-pole out-

puts).
– Test pulses for outputs that are switched off: see technical details
– Outputs that are switched off are switched on for the duration of the test pulse.
– The load must not switch on because of the test.

Excluding individual outputs from the output test (only on single-pole outputs):

}

If a plant is particularly sensitive to the test pulses, the output test may be switched off

for individual outputs.

}

The test must be replaced by other measures, depending on the safety requirement.

}

When test pulses are switched off:

– The correct switch status is always checked.
– The output's ability to switch will not be detected until the next time the output is

switched on/off.

Testing for shorts

}

A test is regularly carried out to check for shorts between the outputs.

}

For applications in accordance with Category 4, PL e and SIL 3, detection of shorts be-

tween contacts must be guaranteed either via the on/off test or through other measures
(e.g. asynchronous switching). A short between contacts must be simulated during
commissioning.

4.4