beautypg.com

Charge air cooler installation, Cont’d – Vortech 2005-2010 Ford 4.6L 3v Mustang GT User Manual

Page 49

background image

P/N: 4FU020-010 v6.2, 06-08-10

©2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Corp. Secured

27

8. CHARGE AIR COOLER INSTALLATION

(CHARGE COOLED KITS ONLY)

, cont’d

NOTE: When installing the cooler, make

sure that the water ports are

configured as shown in Figs.

8B-a, 8B-q. The “top cooler port”

must be the highest point on the

cooler for proper air purging.

B.

WATER COOLER ASSEMBLY

INSTALLATION, cont’d

7.

Attach the previously assembled water cooler

to the bolts and spacers and secure with the

8mm nuts and washers provided. Tighten all

cooler hardware at this time. (See Fig. 8B-e.)

8.

Attach the supplied short 90° hose (7U030-

065) to the top port on the CAC cooler as

shown. (See Fig. 8B-f.)

9.

Install one of the supplied 3/4" hose unions

into the open end of the previously installed

90° hose and secure. (See Figs. 8B-f, 8B-q.)

Fig. 8B-e

Fig. 8B-f

3/4" HOSE

UNION

SHORT 90°

ELBOW