Hanna Instruments HI 98280 User Manual
Page 30

30
• When the measure is stable, “Ready” is shown.
Press
• The messages “Storing data on probe, please
wait...” and “Updating GLP data, please wait
...” appear.
Note
Note
Note
Note
Note
If pH calibration is not required, the meter allows to skip to the EC
quick calibration, by pressing the
If the pH sensor is missing the message “pH sensor not installed! Skip
to conductivity calibration” appears.
• After the pH calibration is completed, the
“Conductivity” option will start blinking.
• When the measure is stable, “Ready” appears.
Press
• The messages “Storing data on probe, please
wait...” and “Updating GLP data, please wait
...” appear.
Note
Note
Note
Note
Note
If EC calibration is not required, skip to the DO quick calibration, by
pressing the
• The message “Empty the beaker. Shake the
probe and put it in the beaker again” appears.
• Unscrew the calibration beaker and remove
the solution.
• To dry the probe shake it as you would do with a clinical thermometer. Pay
attention that no drops remain on the DO sensor.
Note
Note
Note
Note
Note
Do not use paper to dry the probe, to not damaging the sensor.
• Screw back the calibration beaker on the probe body. firm> to store calibration data. • The messages “Storing data on probe, please wait...” and “Updating GLP data, please wait...” appear. • The 3-item calibration screen appears again and the checkboxes corresponding to the cali- • Press Note Note Note Note Note To quit a quick calibration procedure, press ESC at any time.
• Press
• When measurement is stable, the message “Ready” appears. Press
brated parameters will be marked.