100 hour, Drilling unit – Ditch Witch JT100AT User Manual
Page 208
JT100/JT100 All Terrain Operator’s
Manual
Service - 207
100 Hour
CMW
©
100 Hour
Drilling Unit
Lube Stabilizers
Lube zerk on each stabilizer with MPG every 100
hours.
Check Track Sprocket Bolts
Check track sprocket bolts every 100 hours.
Tighten to 350 ft•lb (475 N•m). Apply Loctite
®
242
any time bolts are removed.
Location
Task
Notes
DRILLING
UNIT
Lube stabilizers
MPG
Check track sprocket bolts
350 ft•lb (475 N•m)
Check track sprockets
1 3/16” (30 mm)
LOADER/
DRIVER
Lube rotation bearing
MPG
Lube rotation bearing gear teeth
EPS
This manual is related to the following products:
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)