Ditch Witch JT100AT User Manual
Page 139
Systems and Equipment - 138
JT100/JT100 All Terrain Operator’s Manual
Driver/Loader Attachment
CMW
©
Remove Anchors
1.
Start drilling unit engine.
2.
Ensure that anchor driver is attached to loader/driver and slowly swing loader/driver arm to front of
drilling unit.
3.
Attach anchor driver to auger shaft.
4.
Use loader/driver rotation and boom controls to slowly remove auger from ground.
5.
Use latches (B) and pins (A) to secure augers to
auger caps.
6.
Detach anchor driver from auger shaft and raise
loader/driver to safe position.
7.
Insert pull pins to connect ratchet binders to drill
frame.
8.
Rotate ratchet binders to fully raise anchor plate.
9.
Put cap retainers in place and insert snapper pins.
Electric shock will cause death or serious injury. Stay
away.
To help avoid injury: Maintain minimum clearance of 10’ (3 m) between
loader/driver or load being lifted and energized power lines.
Turning shaft will kill you or crush arm or leg. Stay away.
Crushing weight. If load falls or moves, it
could kill or crush you. Use proper procedures and
equipment or stay away.
IMPORTANT: Adjust outer boom while removing auger so that auger maintains 90° angle with
ground.
IMPORTANT: Cap retainers must be securely in
place before driving or transporting machine.