Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual
Page 83
Prepare - 83
JT30 /JT30 All Terrain Operator’s Manual
Plan Bore Path
CMW
AT pipe
Minimum depth (D)
Entry pitch (A)
Setback (B)
Depth to begin steering (S)
3 ft 5 in (1.0 m)
18% / 10.2°
31 ft 11 in (9.7 m)
1 ft 1 in (0.33 m)
4 ft 1 in (1.2 m)
20% / 11.3°
34 ft 7 in (10.5 m)
1 ft 3 in (0.38 m)
4 ft 9 in (1.5 m)
22% / 12.4°
37 ft 4 in (11.4 m)
1 ft 4 in (0.41 m)
5 ft 6 in (1.7 m)
24% / 13.5°
40 ft 0 in (12.2 m)
1 ft 6 in (0.46 m)
6 ft 3 in (1.9 m)
26% / 14.6°
42 ft 7 in (13.0 m)
1 ft 7 in (0.48 m)
7 ft 1 in (2.2 m)
28% / 15.6°
45 ft 2 in (13.8 m)
1 ft 8 in (0.51 m)
7 ft 11 in (2.4 m)
30% / 16.7°
47 ft 8 in (14.5 m)
1 ft 10 in (0.56 m)
IMPORTANT: Numbers in table based on 145’ (44.2 m) minimum bend radius, beacon housing and
1/3 of first drill pipe (L, totaling 6’ 4” [1.9 m]) in the ground before steering.