Shift pipe box, Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual
Page 159
Systems and Equipment - 159
JT30 /JT30 All Terrain Operator’s Manual
Pipeloader
CMW
Shift Pipe Box
Drilling
1.
Shift pipe box when both pipe box status lights
are off (column is empty). If automated
pipeloader is being used, the Information
Center will inform you that it is time to move
the pipe box.
2.
Release pipe box switch when box hits mechanical stops, then move back to align mechanical pointer
in center of appropriate dot on decal (shown) for new column.
Backreaming
1.
Shift pipe box when active column is full. Indicator flag will lift partially when there is room for one more
pipe.
2.
Release pipe box switch when mechanical pointer is in center of appropriate dot on decal (shown) for
new column.
IMPORTANT: Lift arms must be fully raised for pipe box to move.
NOTICE: Damage can occur when lifting with too many pipes in a column. Be aware of the
number of pipes in the column and check indicator flags as column is filled.