Planning, Setting up at jobsite, Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual
Page 65

Operation Overview - 65
JT30 /JT30 All Terrain Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 70.
2.
3.
Classify jobsite. See page 73.
4.
5.
Check supplies and prepare equipment. See page 86.
6.
Setting Up at Jobsite
1.
2.
3.
Unload drilling unit from trailer. See page 97.
4.
Assemble drill string. See page 106.
5.
Position drilling unit and drill frame. See page 102.
6.
Assemble strike system. See page 132.
7.
Anchor drilling unit. See page 130.
8.
Connect fluid system. See page 102.
9.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.