Pipeloading controls, Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual
Page 33

Controls - 33
JT30 /JT30 All Terrain Operator’s Manual
Left Control Console
CMW
Pipeloading Controls
1.
Pipe lift switch
2.
Rear wrench rotation switch
3.
Rear wrench clamp switch
4.
Front wrench clamp switch
5.
Pipe shuttle switch
6.
Pipe gripper switch
7.
Pipe lubricator switch
8.
Pipe box position switch
9.
Add pipe/manual/remove pipe switch
10. Set/Resume switch
Item
Description
Notes
1.
Pipe lift switch
To raise, press top.
To lower, press bottom.
To stop, release.
1
2
3
4
5
6
7
8
9
10
j34om002w.eps
This manual is related to the following products:
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)