Beacon housings, Jt30 /jt30 all terrain operator’s manual, Downhole tools – Ditch Witch JT30AT User Manual
Page 147: Installation, Lid installation
Systems and Equipment - 147
JT30 /JT30 All Terrain Operator’s Manual
Downhole Tools
CMW
Installation
Remove all paint from mating surfaces before attaching any bit to housing. Install screws (p/n 107-277)
and tighten bolts to 120 ft•lb (163 N•m).
Beacon Housings
Lid Installation
1.
Clean all threads, bolt holes and mating surfaces.
2.
Follow tightening sequence (shown).
3.
Use removable thread locker (Loctite
®
242 or
equivalent), if desired.
4.
Tighten bolts to 60-70 ft•lb (81-95 N•m).
5.
Repeat tightening sequence.
Soil
Description
sandy soil
sugar sand, blow sand, or other soils where sand is the predominant component
soft soil
sandy loam
medium soil
loams, loamy clays
hard soil
packed clays, gumbo, all compacted soils
rocky soil
chunk rock, glacial till, cobble, rip rap, gravel
soft rock
soft limestone, sandstone, shale, coral, caliche
hard rock
granite, schist, marble, hard limestone
5
5
5
5
j15om085h.eps
5
6
3
4
1
2