Dlp-e160 verify blsr extension byte mapping, Dlp-e161 single shelf control card switch test – Cisco 15600 User Manual
Page 49
17-49
Cisco ONS 15600 Procedure Guide, R8.0
Chapter 17 DLPs E100 to E199
DLP- E160 Verify BLSR Extension Byte Mapping
DLP-E160 Verify BLSR Extension Byte Mapping
Step 1
In network view, double-click one of the BLSR nodes with OC-N trunk cards that will be reconnected
after a BLSR node removal.
Step 2
Double-click one OC-N BLSR trunk card to open the card view.
Step 3
Click the Provisioning > Line tab.
Step 4
Record on paper the byte in the BLSR Ext Byte column.
Step 5
Repeat Steps
for the second OC-N trunk card.
Step 6
If the trunk cards on each end of the new span are not mapped to the same BLSR extension byte, remap
the extension byte of the trunk cards at one of the nodes. See the
“DLP-E116 Remap the K3 Byte” task
Step 7
Return to your originating procedure (NTP).
DLP-E161 Single Shelf Control Card Switch Test
Step 1
Test the SSXC card switch functionality:
a.
Connect the test set to a slot/port on the node.
b.
Create a one-way STS48c or STS192c circuit (based on the OC-N card connected in Step
) to
monitor with the test set. See
Chapter 6, “Create Circuits.”
c.
Verify that the test set is alarm and error free.
Purpose
This task verifies that the extension byte mapping is the same on BLSR
trunk (span) cards that will be connected after a node is removed from a
BLSR. K3 extension byte mapping is supported on all ONS 15600 OC-48
and OC-192 line cards, as well as the ONS 15454 OC-48 AS card.
Tools/Equipment
OC-N cards must be installed at one or both ends of the BLSR span that
will be connected.
Prerequisite Procedures
DLP-E26 Log into CTC, page 16-33
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Purpose
This task tests the Single Shelf Cross-Connect Card (SSXC) diagnostics
and switching functionality of the TSC and SSXC cards.
Tools/Equipment
The test set specified by the acceptance test procedure, connected and
configured as specified in the acceptance test procedure.
Prerequisite Procedures
DLP-E26 Log into CTC, page 16-33
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Provisioning or higher