beautypg.com

Installation / performance check list, Gas system, Refrigeration system – Reznor R6GP Unit Installation Manual User Manual

Page 48: Electrical system, Venting system

background image

709288B (Replaces 709288A)

*

* AHRI commercial furnace certification listing applies only to 3 phase units

having an input rate 225,000 Btu/hr or greater

Specifications & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (09/12)

INSTALLATION / PERFORMANCE CHECK LIST

GAS SYSTEM

Gas

Type: (circle one)

Natural Gas

Propane

Gas pipe connections leak-tested?

YES

NO

Gas Line Pressure:

____________________________ (in - W.C.)

Is there adequate fresh air supply
for combustion & ventilation?

YES

NO

Installation Altitude:

_________________________________ (FT.)

Deration Percentage:

_________________________________ (%)

Furnace Input:

____________________________________(Btuh)

Supply Air Temperature:

_____________________________ (° F)

Return Air Temperature:

_____________________________ (° F)

Temperature Rise:

_________________________________ (° F)

During Furnace Operation:

Low fire manifold pressure:

______________________ (in - W.C.)

High fire manifold pressure:

______________________ (in - W.C.)

REFRIGERATION SYSTEM

Was unit given 24 hr warm up period
for crankcase heaters?

YES

NO

Did reversing valve energize?

YES

NO

Stage-1 Liquid Pressure (high side) ________________________

Stage-1 Suction Pressure (low side) ________________________

Stage-2 Liquid Pressure (high side) ________________________

Stage-2 Suction Pressure (low side) ________________________

INSTALLATION ADDRESS:

CITY ________________________

STATE ________________

UNIT MODEL #

________________________________________

UNIT SERIAL #

_______________________________________

Unit Installed within the Minimum
clearances specified on page 10?

YES

NO

INSTALLER NAME:

CITY _______________________

STATE ________________

Has the owner’s information been
reviewed with the customer?

YES

NO

Has the Literature Package been left
with the unit?

YES

NO

ELECTRICAL SYSTEM

Electrical connections tight?

YES

NO

Line voltage polarity correct?

YES

NO

Rated Voltage:

___________________________________ VOLTS

L1-L2 Volts:

_____________________________________ VOLTS

L1-L3 Volts:

_____________________________________ VOLTS

L2-L3 Volts:

_____________________________________ VOLTS

Avg.Volts:

_______________________________________ VOLTS

Max. Deviation of Voltage

From Avg Volts ___________________________________ VOLTS

% Volt Imbalance:

________________________________ VOLTS

Blower Motor HP:

________ Sheave Setting ___________# Turns

Has the thermostat been calibrated?

YES

NO

Is the thermostat level?

YES

NO

Is the heat anticipator setting correct?

YES

NO

VENTING SYSTEM

Is the vent hood installed?

YES

NO

Is vent hood free from restrictions

YES

NO

Filter(s) secured in place?

YES

NO

Filter(s) clean?

YES

NO