Installation / performance check list, Gas system, Refrigeration system – Reznor R6GP Unit Installation Manual User Manual
Page 48: Electrical system, Venting system

709288B (Replaces 709288A)
*
* AHRI commercial furnace certification listing applies only to 3 phase units
having an input rate 225,000 Btu/hr or greater
Specifications & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (09/12)
INSTALLATION / PERFORMANCE CHECK LIST
GAS SYSTEM
Gas
Type: (circle one)
Natural Gas
Propane
Gas pipe connections leak-tested?
YES
NO
Gas Line Pressure:
____________________________ (in - W.C.)
Is there adequate fresh air supply
for combustion & ventilation?
YES
NO
Installation Altitude:
_________________________________ (FT.)
Deration Percentage:
_________________________________ (%)
Furnace Input:
____________________________________(Btuh)
Supply Air Temperature:
_____________________________ (° F)
Return Air Temperature:
_____________________________ (° F)
Temperature Rise:
_________________________________ (° F)
During Furnace Operation:
Low fire manifold pressure:
______________________ (in - W.C.)
High fire manifold pressure:
______________________ (in - W.C.)
REFRIGERATION SYSTEM
Was unit given 24 hr warm up period
for crankcase heaters?
YES
NO
Did reversing valve energize?
YES
NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Stage-2 Liquid Pressure (high side) ________________________
Stage-2 Suction Pressure (low side) ________________________
INSTALLATION ADDRESS:
CITY ________________________
STATE ________________
UNIT MODEL #
________________________________________
UNIT SERIAL #
_______________________________________
Unit Installed within the Minimum
clearances specified on page 10?
YES
NO
INSTALLER NAME:
CITY _______________________
STATE ________________
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
ELECTRICAL SYSTEM
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Rated Voltage:
___________________________________ VOLTS
L1-L2 Volts:
_____________________________________ VOLTS
L1-L3 Volts:
_____________________________________ VOLTS
L2-L3 Volts:
_____________________________________ VOLTS
Avg.Volts:
_______________________________________ VOLTS
Max. Deviation of Voltage
From Avg Volts ___________________________________ VOLTS
% Volt Imbalance:
________________________________ VOLTS
Blower Motor HP:
________ Sheave Setting ___________# Turns
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
YES
NO
VENTING SYSTEM
Is the vent hood installed?
YES
NO
Is vent hood free from restrictions
YES
NO
Filter(s) secured in place?
YES
NO
Filter(s) clean?
YES
NO