Reznor R6GP Unit Installation Manual User Manual
Page 35

35
Table 11. R6GP-120C-235Ca Series / 230V - Downflow Configuration
R6GP-120(C/D)-235Ca
Factory Standard: 1.5Hp Down-flow Performance Chart
‡ Indicates Factory Sheave Setting
External
Unit
Static
(in-Wg)
Operating
@ 230 or
460 Volts
Adjustable Motor Sheave Setting
Fully
Closed
1/2
Turn
Open
1
Turn
Open
1.5
Turns
Open
2
Turns
Open
2.5
Turns
Open
3
Turns
Open
3.5
Turn
Open ‡
4
Turns
Open
4.5
Turns
Open
5
Turns
Open
5.5
Turns
Open
6
Turns
Open
0.1
CFM
4484
4336
4187
4037
3886
RPM
668
650
631
614
596
kW
1.40
1.29
1.19
1.10
1.00
0.2
CFM
4409
4252
4096
3939
3778
3616
RPM
689
671
653
635
616
598
kW
1.43
1.31
1.21
1.10
1.01
0.92
0.3
CFM
4317
4158
3998
3819
3639
3474
3309
RPM
709
692
674
656
638
619
600
kW
1.44
1.32
1.20
1.11
1.01
0.92
0.83
0.4
CFM
4201
4050
3881
3712
3529
3345
RPM
727
711
694
677
658
640
kW
1.46
1.34
1.22
1.10
1.01
0.91
0.5
CFM
4092
3937
3782
3597
3411
3192
RPM
746
729
712
696
679
660
kW
1.47
1.35
1.24
1.12
1.01
0.91
0.6
CFM
4000
3837
3647
3457
3250
RPM
764
749
732
716
698
kW
1.48
1.35
1.23
1.11
1.00
0.7
CFM
3890
3701
3511
3301
RPM
783
768
752
736
kW
1.49
1.36
1.23
1.11
0.8
CFM
3760
3575
3365
RPM
796
786
770
kW
1.47
1.34
1.22
0.9
CFM
3551
3376
3215
RPM
814
802
788
kW
1.41
1.31
1.19
1.0
CFM
3204
RPM
818
kW
1.28
1.1
CFM
RPM
kW
1.2
CFM
RPM
kW
Values includes losses for: Unit Casing, 2” Disposable (Pleated) Filters & Dry Evaporator Coil
For operation at 208V: Deduct approximately 0.5% from Cfm
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)