11 final installation checklist, 12 operation checklist, Installation instructions – GE CS975SDSS User Manual
Page 46
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Installation Instructions
11 FINAL INSTALLATION CHECKLIST
Check to make sure the circuit breaker is closed
(RESET) or the circuit fuses are replaced.
Be sure power is in service to the building.
Note (on some models):
If the clock flashes
"bAd" and then "LinE" with a loud tone, the
neutral connection to the range is not wired
correctly. Check the terminal block connections
and/or house wiring to correct.
Check to be sure that all packing materials
and tape have been removed. This will include
tape on metal panel under control knobs
(if applicable), adhesive tape, wire ties, cardboard
and protective plastic. Failure to remove these
materials could result in damage to the appliance
once the appliance has been turned on and
surfaces have heated.
Check to make sure that the rear leveling leg
is fully inserted into the Anti-Tip bracket and
that the bracket is securely installed.
12 OPERATION CHECKLIST
• Turn on one of the surface units to observe that
the element glows within 50 seconds. Turn the
unit off when glow is detected. If the glow is not
detected within the time limit, recheck the range
wiring connections. If change is required, retest
again. If no change is required, have building
wiring checked for proper connections and
voltage.
• Check to make sure the Clock (on models
so equipped) display is energized. If a series
of horizontal red lines appear in the display,
disconnect power immediately. Recheck the
range wiring connections. If change is made
to connections, retest again. If no change is
required, have building wiring checked for proper
connections and voltage. It is recommended that
the clock be changed if the red lines appear.
• Be sure all range controls are in the OFF position
before leaving the range.
46