26
28.
Shim the first shoulder of the axle assembly to
achieve a 5 to 20 thousands measurement of
(Z). See Figure 13.
NOTE: Z = 5 to 20 thousands.
NOTE: A 5 to 20 thousands measurement will
allow the unit to operated smoothly, without bind-
ing.
29.
Drive the centering roll pins up using a punch.
See Figure 14.
30.
Place a bead of sealant around the outer
perimeter of the mating surface.
NOTE: Use Loctite 5999 or equivalent.
31.
Set the inner housing on top of the outer axle
housing and align the centering roll pins by tap-
ping them into place using a punch and a small
hammer.
32.
Secure the inner housing to the outer axle hous-
ing with the ten hex washer head screws and hex
flange nuts removed earlier using a 3/8” socket
and a 7/16” wrench.
33.
Make certain the centering roll pins are correctly
set in place.
34.
Place the brake actuation arm onto the brake
shaft and drive the roll pin into place using a
5/32” punch. See Figure 15.
Figure 13
Shim
Figure 14
Centering Roll
Pins
Inner Housing
Hex Washer
Head Screws
Figure 15
Brake Actuation
Arm
Brake Shaft