beautypg.com

Waterworks Boulevard Thermostatic with Shutoff Trim with Metal Lever Handle User Manual

Installation guidelines, Fig. 1a

background image

Boulevard Thermostatic Valve With On/Off Control

07/06

W A T E R W O R K S

®

These guidelines have been prepared for the professional contractor to aid in the installation of:

BOULEVARD THERMOSTATIC VALVE WITH ON/OFF CONTROL

(GUSV46R and BDSV58)
All dimensions are based on original specifications and are subject to change and variation.

Please consult your Design Associate for current specifications.

Installation Guidelines

Figure 1

9 10

6

7

3

/

4

"Threaded Nipple

8

11

13

12

1

GUSV46R (rough) + BDSV58 (trim)

H

C

6

7

/

8

"

3

7

/

16

"

3

3

/

16

"

10

9

/

16

"

4

1

/

4

"

3

1

/

8

"

2

1

/

2

"

2

5

/

16

"

2

3

/

4

"

3"

Fig. 1a

6

5. Valve body rough-in depth is 2 ½" the centerline of the

inlets to the face of the finished wall.

6. Be sure your installation conforms to local codes.

7. This valve assembly includes 2 valves - a thermostatic

valve and a volume control/on/off valve. The thermo-
static valve only mixes hot and cold water and does not
have volume control. A wall valve is included as part of
the assembly for volume control/on/off. Additional wall
valves can be installed for each fitting that will have water
flowing to it.

8. This product must be installed by a professional contractor.

9. Refer to the specification and assembly drawings attached.

Valves are sold partially assembled but shown fully disas-
sembled for illustrative and service purposes only.

10. If soldering any connections, remove cartridge to

prevent damage to seals and internal assembly.

11. The trim should be on-site prior to rough in and allows

the installer to visualize the installation.

12. Inspect this product to assure you have all parts shown

that are required for proper installation.

13. Check incoming water pressure; ideal operating pressure

is 50-60 psi. The minimum is 25 psi. and the maximum is
80 psi.

ROUGH IN:

14 . Make sure the valve body (1, 1a) is positioned accord-

ing to valve markings so the inlets are situated with hot
piped on the left and cold piped on the right. Positioned
correctly, notice the inlets are below an imaginary
horizontal line drawn between the 2 cover screws (3).

15. IMPORTANT: Valve rough-in depth is 2-1/2 “measured

from the centerline of the inlets to the surface of the
finished wall.

16. Run 3/4” copper supply lines to the proper height of the

valve inlets and be sure to secure all piping and fittings.

IMPORTANT

1. To ensure this product is installed properly, you must

read and follow these guidelines.

2. The owner/user of the valve must keep this informa-

tion for future reference.

3. This valve includes integrated service stops. Make sure

the tile guard is in place.

4. This valve features anti scald protection.The risk of

scalding exists until the installer has properly

calibrated/adjusted the temperature setting during final

trim installation.

1a

1

2

2a

3 x 2

4

5