Waterworks Henry Wall Mounted Articulated Pot Filler, Metal Cross Handle User Manual
Installation guidelines
PRODUCT SUPPORT 800.927.2120 8am - 6pm EST
HENRY
Wall Mounted Articulated Pot Filler with Metal Cross Handle
Installation Guidelines
Page 1 of 2
Rev - 01
10.16.2014
These guidelines have been prepared for the professional contractor to aid in the installation of:
HENRY WALL MOUNTED ARTICULATED POT FILLER WITH METAL CROSS HANDLE
(STYLE No. HNPF01, HN01PF UK)
All dimensions are based on original specification and are subject to change and variation.
Please consult your Design Associate for current specifications.
STYLE No. HNPF01†
SPECIFICATIONS:
Fittings Hole Diameter: Ø1-1/4" (32mm)
Handle Turn Angle: Quarter Turn
Inlet Connection Size & Type: 1/2" Female NPT†
Spout Reach: 21-3/4” (552mm)
Spout Swivel: Yes
Water Pressure Minimum: 20 psi (1.4 Bar)
Water Pressure Maximum: 80 psi (5.5 Bar)
Water Pressure Recommended: 45 psi (3 Bar)
† UK Style No.
HN01PF is supplied with a BSP adapter,
assembly required.
IMPORTANT:
¾ To ensure this product is installed properly, you must
read and follow these guidelines.
¾ The owner/user of this product must keep this
information for future reference.
¾ This product must be installed by a professional
licensed contractor.
¾ Be sure your installation conforms to all federal, state,
and local codes.
¾ In the State of Massachusetts, all installations must
comply with the rules and regulations set forth within
248 CMR.
¾ This product must be on-site prior to rough-in. This
allows the installer to visualize the installation and
verify dimensions.
¾ Inspect the product to ensure you have all the parts
required for proper installation.
¾ Use only a strap wrench or protected/smooth-jaw
wrench on any finished surface.
¾ DO NOT use putty. Putty contains oil and can cause
permanent discoloration on certain materials such as
marble, granite and any porous surface.
¾ Refer to the specification and assembly drawings
attached. Product is sold partially assembled but
shown fully disassembled for illustrative and service
purposes only.
¾ Check incoming water pressure.
¾ NOTE: The screws on the face of the handle & on the
spout swivel are purely aesthetic. DO NOT REMOVE.
ROUGH-IN:
1. Determine the ideal location based on the clients
preference and install adequate blocking to properly
support the inlet supply and MOUNTING HARDWARE.
2. Finish the rough-in by installing a well supported 1/2"
male NPT connection. The inlet supply must project
1/2" to 3/4” from the finished wall. See FIGURE – 01.
¾ REQUIRED: The 1/2" male NPT connection must be
secure, plumb and level. Failure to properly secure the
pipes will cause the POT FILLER to sit crooked.
FINISHED WALL
1/2" MALE NPT
1/2" MIN
3/4" MAX
PROJECTION FROM
FINISHED WALL
FINISHED WALL
1/2" MALE NPT
FIGURE – 01
3. Make sure a Ø1-1/4” (32mm) hole is cut in the finished
wall to allow for proper mounting.
INSTALLATION:
4. Install the MOUNTING PLATE on the finished wall
using the SCREWS provided. Install the appropriate
ANCHORS (not supplied) based on the mounting
surface material. See FIGURE – 02.