beautypg.com

Waterworks Henry Wall Mounted Articulated Pot Filler, Metal Cross Handle User Manual

Installation guidelines

background image


PRODUCT SUPPORT 800.927.2120 8am - 6pm EST

HENRY
Wall Mounted Articulated Pot Filler with Metal Cross Handle

Installation Guidelines

Page 1 of 2

Rev - 01


10.16.2014

These guidelines have been prepared for the professional contractor to aid in the installation of:
HENRY WALL MOUNTED ARTICULATED POT FILLER WITH METAL CROSS HANDLE
(STYLE No. HNPF01, HN01PF UK)
All dimensions are based on original specification and are subject to change and variation.
Please consult your Design Associate for current specifications.

STYLE No. HNPF01†

SPECIFICATIONS:

Fittings Hole Diameter: Ø1-1/4" (32mm)
Handle Turn Angle: Quarter Turn
Inlet Connection Size & Type: 1/2" Female NPT†
Spout Reach: 21-3/4” (552mm)
Spout Swivel: Yes
Water Pressure Minimum: 20 psi (1.4 Bar)
Water Pressure Maximum: 80 psi (5.5 Bar)
Water Pressure Recommended: 45 psi (3 Bar)

† UK Style No.

HN01PF is supplied with a BSP adapter,

assembly required.


IMPORTANT:

¾ To ensure this product is installed properly, you must

read and follow these guidelines.

¾ The owner/user of this product must keep this

information for future reference.

¾ This product must be installed by a professional

licensed contractor.

¾ Be sure your installation conforms to all federal, state,

and local codes.

¾ In the State of Massachusetts, all installations must

comply with the rules and regulations set forth within
248 CMR.

¾ This product must be on-site prior to rough-in. This

allows the installer to visualize the installation and
verify dimensions.


¾ Inspect the product to ensure you have all the parts

required for proper installation.

¾ Use only a strap wrench or protected/smooth-jaw

wrench on any finished surface.

¾ DO NOT use putty. Putty contains oil and can cause

permanent discoloration on certain materials such as
marble, granite and any porous surface.

¾ Refer to the specification and assembly drawings

attached. Product is sold partially assembled but
shown fully disassembled for illustrative and service
purposes only.

¾ Check incoming water pressure.

¾ NOTE: The screws on the face of the handle & on the

spout swivel are purely aesthetic. DO NOT REMOVE.

ROUGH-IN:

1. Determine the ideal location based on the clients

preference and install adequate blocking to properly
support the inlet supply and MOUNTING HARDWARE.

2. Finish the rough-in by installing a well supported 1/2"

male NPT connection. The inlet supply must project
1/2" to 3/4” from the finished wall. See FIGURE – 01.


¾ REQUIRED: The 1/2" male NPT connection must be

secure, plumb and level. Failure to properly secure the
pipes will cause the POT FILLER to sit crooked.

FINISHED WALL

1/2" MALE NPT

1/2" MIN

3/4" MAX

PROJECTION FROM

FINISHED WALL

FINISHED WALL

1/2" MALE NPT

FIGURE – 01

3. Make sure a Ø1-1/4” (32mm) hole is cut in the finished

wall to allow for proper mounting.

INSTALLATION:

4. Install the MOUNTING PLATE on the finished wall

using the SCREWS provided. Install the appropriate
ANCHORS (not supplied) based on the mounting
surface material. See FIGURE – 02.