beautypg.com

Auger unloading: rear hopper – Great Plains NTA3007HD Operator Manual User Manual

Page 70

background image

66 NTA907HD or NTA3007HD

166-207M

04/04/2011

Auger Unloading: Rear Hopper

1.

Position drill well clear of overhead electrical lines.

2.

Raise openers (page 33) and fold wings (page 35).

3.

Lower openers (page 32) to provide maximum clear-
ance at center section.

4.

Shut down hydraulics or set Fan/Auger circuit to
Float or Neutral.

5.

Open lid slightly on rear hopper.

Refer to Figure 73
6.

Deploy auger (page 49).

7.

Swing inlet hopper under rear meter.
(see page 66 for additional steps if unloading front
hopper)

8.

Position collection bin or vehicle under auger outlet.

9.

Install the calibration crank (page 57).

Null4:

Null4:

Unload Prep.: Hydraulic Circuit Operation

Lift

Fan,

Auger

Fold, Tilt,

Marker

Transport

Hooks

Neutral

Float or

Neutral

Neutral

Neutral

Null4:

Figure 73

Unload Rear Hopper with Auger

29409

4

This manual is related to the following products: