Auger unloading: rear hopper – Great Plains NTA3007HD Operator Manual User Manual
Page 70

66 NTA907HD or NTA3007HD
166-207M
04/04/2011
Auger Unloading: Rear Hopper
1.
Position drill well clear of overhead electrical lines.
2.
Raise openers (page 33) and fold wings (page 35).
3.
Lower openers (page 32) to provide maximum clear-
ance at center section.
4.
Shut down hydraulics or set Fan/Auger circuit to
Float or Neutral.
5.
Open lid slightly on rear hopper.
Refer to Figure 73
6.
Deploy auger (page 49).
7.
Swing inlet hopper under rear meter.
(see page 66 for additional steps if unloading front
hopper)
8.
Position collection bin or vehicle under auger outlet.
9.
Install the calibration crank (page 57).
Null4:
Null4:
Unload Prep.: Hydraulic Circuit Operation
Lift
Fan,
Auger
Fold, Tilt,
Marker
Transport
Hooks
Neutral
Float or
Neutral
Neutral
Neutral
Null4:
Figure 73
Unload Rear Hopper with Auger
29409
4