Field set-up checklists – Great Plains NP30A 30-foot Operator Manual User Manual
Page 84
80
NP30A or NP40A
Great Plains Manufacturing, Inc.
407-502M
2014-05-20
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/fertilizer applicator configuration. Additional
or fewer steps may be necessary depending on tractor
features, fertilizer applicator options and accessories.
Mechanical Checklist (Tractor Hitching)
Page
Fertilizer Applicator hitched
Hitch pin locked (pull-type)
Safety chain secured to tractor (pull-type)
30
Parking jack or stands stowed
30
Electrical Checklist
Page
Verify electrical hookups solid
Turn console POWER switch to ON. Check
console and observe any diagnostic
messages
a
a. Refer to console manual.
Hydraulic System Checklist
Page
Check tractor hydraulic reservoir full
-
Make hydraulic connections
Inspect connections for leaks
-
Perform a raise operation
(leave transport locks in)
Unfold applicator
Row Units Checklist
Page
Check tubing connections to knives/tines
Check knife/tines outlets
Check knife/tine shoe condition
Check shoes all at same height
Check knife/tine shank alignment
Check knife shear bolts in place
Check coulter height
Check coulter-to-row alignment or caster
Check sealer adjustments
Check sealer disc or spider condition
Mechanical Checklist (post-Hitching)
Page
Raise applicator.
Disengage transport locks
Engage hydraulic depth stop (if nec.)
45
Check front-to-rear level
38
Check side-to-side level
Set application depth
NH
3
System Checklist (Cart Unhitched)
Page
Shut-off rope routed to tractor cab
Emergency shut-off valve closed
On/off solenoid valve closed
Control valve closed
Console POWER switch off
All bleed valves closed (3 or more)
Breakaway coupler mated (visual check)
All hydrostatic relief valve caps seated
Mechanical Checklist (Cart Hitching)
Page
Nurse tank hitched
Hitch pin locked
Safety chains secured
NH
3
Checklist (Cart Hitched)
Page
Check breakaway firmly mated
Check breakaway swivel function
Remove inlet Acme cap.
Inspect inlet with mirror.
Check withdrawal valve and all nurse tank
hose valves closed
Check for signs of liquid NH
3
in hose
Separate hose and Acme plug
Route hose to breakaway
Connect hose to breakaway