Fb r l – Great Plains NTA3510 Installation Instructions User Manual
Page 28

Great Plains Mfg., Inc.
28
Blockage Monitor Kits
168-414M
10/29/2008
Refer to Figure 63 on page 27 and Figure 64
31. Following the large inlet seed tube to Tower 1, route
20ft extension harness
to the WSMB at Tower
one. Connect it to the WSMB harness
secure harness with ties until the next step.
Refer to Figure 65 and Figure 63 on page 27
32. Select one new:
Following the Tower 1 inlet seed tube again, route
this extension between the WSMB harness at
Tower 1 and the WSMB harness at Tower 2. Con-
nect both ends of the extension.
Allowing slack for wing folding, secure harnesses
and
with cable ties.
Refer to Figure 66 and Figure 63 on page 27
33. Select one new:
Following the inlet seed hose for Tower 5, route this
extension between the WSMB harness at Tower 4
and the WSMB harness at Tower 5. Connect both
ends of the extension.
Allowing slack for wing folding, secure harness
with cable ties.
34. Skip to “Close-Out” on page 29.
Figure 64: NTA35:
Implement WSMB to Tower 1
16201
T1
F
B
R
L
T2
T3
Figure 65: NTA35:
Tower 1 to Tower 2
16201
T1
F
B
R
L
T2
T3
Figure 66: NTA35:
Tower 4 to Tower 5
16201
T3
F
B
R
L
T5
T4