Cta-4000 and 4000hd installation, Cta: install wsmbs – Great Plains NTA3510 Installation Instructions User Manual
Page 10

Great Plains Mfg., Inc.
10
Blockage Monitor Kits
168-414M
10/29/2008
CTA-4000 and 4000HD Installation
This installation requires one of the following kits:
168-408A
CTA4000/HD-8006 (80 row, 6in)
CTA4000/HD-6575 (65 row, 7.5in)
CTA4000/HD-5010 (50 row, 10in)
Additional installation information is found in the
DICKEY-john IntelliAg Air Cart Control Operator’s man-
ual.
Note: The DICKEY-john manual has only general har-
ness routing for the Great Plains air drills, and
some cable part numbers are slightly different from
those in the kits.
Continuing from step 8 on page 3.
Refer to Figure 18 and Figure 19
9.
Select five (5):
At each tower, remove the nuts
and lock washers
at the lower U-Bolt
, and mount the plate
.
Plate orientation is small holes to top, and:
on Towers 1 & 5: extension to drill center
on Towers 2 & 4: extension to drill rear
on Tower 3: extension to left
CTA: Install WSMBs
Start with the left tower (Tower 1).
10. Select one:
INTAG WSMB/FLW MNTR MODULE 18R
and two sets:
802-224C HHCS 1/4-20X1 1/4 GR5
804-006C WASHER LOCK SPRING 1/4 PLT
803-006C NUT HEX 1/4-20 PLT
Mount the WSMB
on the tower side of the plate
, with the mounting ears flush against the plate
and the connector ports facing down.
11. Repeat step 10 for the remaining towers
Figure 18: CTA:
CTA4000 Tower Arrangement
17186
T1
T2
T3
T4
T5
U
D
F
B
L
R
Figure 19: CTA:
Module Mount
27058