Nta30: install wsmb harnesses, Apped at step 23, Ud l r – Great Plains NTA3510 Installation Instructions User Manual
Page 20

Great Plains Mfg., Inc.
20
Blockage Monitor Kits
168-414M
10/29/2008
NTA30: Install WSMB Harnesses
Start with Tower 1 (left wing, left tower)
22. Select one:
Join the row harness connector
connector on the row harness
.
Plug the WSMB connectors
These connectors are not interchangeable, and are
keyed to ensure correct insertion.
23. Select two:
800-082C CABLE TIE .31X21.5 6DIA 120LB
Coil up excess row harness leads and tie the bundle
to the tower, above and below the lower U-bolt.
24. Repeat step 22 and step 23 for each tower.
Refer to Figure 44, 45 and Figure 46 on page 21
25. Select one new:
26. At the front center of the drill, locate the existing
implement WSMB:
PLNTR CNTRL OUTPUT MODULE(POM)
At the WSMB connectors, follow harness:
DJ 2SOL YP24LIFT/HITCH FCM HRN
Locate the CAN bus terminator:
27. Remove and save the terminator
.
Connect the 20ft harness extension
(two connectors).
Refer to Figure 45 and Figure 46 on page 21
28. At Tower 4, plug the saved CAN bus terminator
into the WSMB harness
Figure 43: NTA30:
WSMB Harness
28200
1
2
3
4
5
U
D
L
R
1
Figure 44: NTA30:
Existing WSMB
Location
28438
Figure 45: NTA30:
CAN Terminator
28429