Air Pressure Gauge

Refer to Figure 161
Row-Pro™ is designed to run at 150 psi. When the psi
drops to 135 the compressor engages and builds back
up to 150 psi. Duty cycle varies based on air usage.

Check for Air Leaks

Before going to the field check for air leaks.

1.

Turn the compressor on and let it pressure up the
primary system until it automatically shuts off. If the
system loses pressure then check for leaks.

2.

The cylinders can be pressurized to check for leaks
by setting IntelliAg

®

down pressure Control Mode to

“manual” and activating the “decrease” button. It can
be set to add air to individual sections or all sections
at once.

Setting the Springs

Refer to Figure 162
When going to the field, using the adjuster cam, set the
springs

to the highest tension that is needed to keep

the down pressure and the system at the target rate.

The actual target rate is going to be different depending
on the field conditions, soil type and other factors. The
only way to gauge where you want the setting is to oper-
ate the system for a short time then go behind the planter
and check the furrow.

Note: Adjustment to the spring pressure may need to be

made if the depth is reset or the closing wheel down
pressure is adjusted.

IntelliAg

®

tracks the pressure and sends warnings:

• High Alarm: too much pressure, move spring pressure

down.

• Low Alarm: too little pressure, kick spring pressure up.

Null4:

Null4:

Figure 161

Air Pressure Gauge

32098

Null4:

Figure 162

Setting the Springs

32085

1

1