beautypg.com

Field operation – Great Plains YP1630F-1670 Operator Manual User Manual

Page 48

background image

44

YP1630F

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-832M

Table of Contents

Index

2012-12-27

Field Operation

Perform all steps in “Pre-Start Checklist” on page 22
and “Field Setup Checklist” on page 41.

SRM: Seed Rate Manual (SRM), or
DICKEY-john® PM400 Console Manual

Note: Use Depth Control mode. If the tractor 3-point

hitch control is set for Load Control, hitch
movement may cause changes in row unit depth
resulting in uneven depth control.

First Pass Operation Checklist

Page

1. Set planting rate.

SRM

2.

Unfold marker on next-row side.

43

3.

With tractor at high idle, set fan hydraulic
circuit to low flow, engage circuit. Gradually
adjust fan hydraulic flow to obtain
recommended pressure

42

4.

Pull forward, lower planter, and begin
planting for a short distance.

5.

Stop. Assess:
planting depth,
skips or doubles,
seed spacing (to verify population),
press wheel operation and
fertilizer and/or treatment application (if in
use)

6.

Continue planting for at least 10 seconds (so
that the seed monitor is reporting a stable
population number). Verify that it is your
desired rate.

7.

Make necessary adjustments

47

Sharp Field Turns Checklist

Page

1. Fold marker

43

2.

Raise planter

27

3.

Make turn

4.

Lower planter

27

5.

Unfold marker on next-row side.

43

6.

Resume planting.

Suspending Planting Checklist

Page

1. Stop tractor

2.

Fan hydraulic circuit to Float or Neutral

42

3.

Fold Marker

43

4.

Raise planter

27

Ending Planting Checklist

Page

1. Suspend operations as above, then

2.

Fold planter

28

3.

Install transport locks

29

4.

Lights ON

-

5.

Transport

31

This manual is related to the following products: