beautypg.com

Prepare meter doors, Load fertilizer, Lid closing – Great Plains YP1630F-1670 Operator Manual User Manual

Page 41

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

37

2012-12-27

Table of Contents

Index

401-832M

Prepare Meter Doors

Material and Time Loss Risk:
Check the doors before loading, every time. If the Clean-Out
door is open, even slightly, it will be essentially impossible to
close adequately with material loaded.

Refer to Figure 33
8.

Verify that both doors at the bottom of the central
hopper meter are tightly closed. After long storage,
they are commonly tied slightly closed, to allow
drainage of condensation and to avoid permanently
compressing the door seals. The doors must be fully
closed for loading and field operations.

If the hopper is empty, Great Plains advises opening
both doors, wiping down the meter lips and door
seals, then fully closing both doors.

Load Fertilizer
Add dry fertilizer to the hopper.

Do not fill above the 3500 L (100 BU.) mark.

Use only granular dry fertilizer.

Do not add liquid treatments.

Lid Closing

Refer to Figure 34
1.

Swing lid over opening until capture hook

is

centered on U-bolt.

2.

Open handle

and engage hook

on U-bolt.

3.

Close handle

for operations or short-term parking.

For long-term storage, do not engage hook or latch
handle, to avoid deforming the seal.

4.

For storage, particularly unlatched, a padlock
through both U-bolts deters unauthorized lid
opening, preventing entry of pests, debris and
precipitation.

Close walkboard rail section if opened for auger material
loading.

Figure 33

Central Hopper Meter Doors

34449

Figure 34

Hopper Lid Relatching

32455

2

3

3

2

3

2

This manual is related to the following products: