Tank Loading: Quick-Fill
Complete step 1 through step 7 on page 50.
8.
Check that tank lids are secure.
9.
Connect the source supply line to the quick-fill
inlet
.
10. Open any shut-off valve at the source outlet line.
11. If the source is pumped, start the pump.
12. Open the cart inlet valve
.
13. Observe the sight gauge
(not shown) on the
tank(s) being filled. Do not fill above the
“200” (gallon) mark.
14. Close the source outlet shut-off valve, and if none,
close the cart inlet shut-off valve
.
15. Stop the source pump (if any). Close the cart inlet
shut-off valve
if not already closed.
16. Unless already at the field, close both tank discharge
valves
to prevent tank-to-tank transfers during
transport.
Tank Loading: Top-Fill
Complete step 1 through step 7 on page 50.
17. Deploy the ladder(s) as needed for access to the
Refer to Figure 45
18. Unscrew the lid
on the tank to be filled.
19. Fill the tank. If filling both tanks from one tank, allow
time for the levels to balance.
20. Observe the sight gauge on the tank(s) being filled.
Do not fill above the “200” (gallon) mark.
21. Screw on lid. Return ladder to storage/transport
position.
Null4:
Null4:
Figure 44
Quick-Fill Inlet
31372
11
12
22
16
13
17
11
12
15
12
12
13
Null4:
Figure 45
Tank Lid Open for Filling
31390
1
1