Figure 23. gate base bolt positioning – Unitec Wash Select II POS Installation Manual User Manual
Page 63
W A S H
S E L E C T
I I
Document Number:
WS21001
57
With the dimensions as specified above, you will need to loop the wire 5 times around
the loop.
Cut the loop according to the guidelines provided in the installation documentation
that comes with the gate.
b) Installing the Gate
The holes in the base of the gate are 3/4" in diameter. The mounting bolts must be
3/8” in diameter.
Figure 23. Gate Base Bolt Positioning
4. Electrical Installation
Make sure all power is disconnected from the gate and Wash Select II prior to
beginning this procedure.
a) Wire the Wash Select II Unit
1.
Connect one signal wire to pin 1, and one signal wire to pin 2 of phoenix
connector J18.
2.
Connect one signal wire to pin 1, and one signal wire to pin 2 of phoenix
connector J19.
3.
Replace the phoenix connectors.
b) Wire the Gate
1.
Connect the signal wire from J18, pin 1 to terminal 50 inside the gate.
2.
Connect the signal wire from J18, pin 2 to terminal 1 inside the gate.
3.
Connect the signal wire from J19, pin 1 to terminal 42 inside the gate.
4.
Connect the signal wire from J19, pin 2 to terminal 52 inside the gate.
5.
Jump terminal 48 to terminal 22 inside the gate.
Document Title:
Wash Select II POS Installation Manual