Unitec Wash Select II POS Installation Manual User Manual
Page 27
W A S H
S E L E C T
I I
Document Number:
WS21001
21
Figure 12. Inside the AC Connector
2.
Remove the line insulator and set it aside for the next step. Remove the screw
holding the stabilizer plate in place and set both aside until after you have finished
securing the wires.
3.
Thread the power cord (with the 3 exposed conductors) through the hole in the
bottom of the line insulator. Continue to feed it through until about ½” of outer
insulation is protruding through the top. (See Figure 10)
Figure 13. Thread Power Cord Through Line Insulator
4.
Even though the proper wire configuration is embossed in the plastic cover, it is
often very difficult to locate and verify. Refer to the drawing below for Line (HOT),
Neutral and Ground connections. Secure these power wires by unscrewing the 3
terminal screws just enough to slide the end of the wires through the provided
clamps. Re-tighten the screws to hold the wires in place.
Document Title:
Wash Select II POS Installation Manual