Figure 5. straight base figure 6. angled base – Unitec Wash Select II POS Installation Manual User Manual
Page 17

W A S H
S E L E C T
I I
Document Number:
WS21001
11
Figure 5. Straight Base
Figure 6. Angled Base
1.
Mark the 4 holes that you intend to drill in order to mount the Wash Select II
optional base. Mark the holes with a marker as the base is sitting on top of the
concrete. It is important to keep in mind that the conduit run will need to protrude
through the large opening in the lower right corner, at least 3 inches.
Warning:
DO NOT BEGIN MOUNTING OF THE BASE UNTIL ALL WIRES & CABLES HAVE
BEEN PULLED THROUGH THE CONDUIT!
Document Title:
Wash Select II POS Installation Manual
This manual is related to the following products: