beautypg.com

Tweco 15XC CE Merlin PAK User Manual

Page 87

background image

Manual 0-2529

4 - 15

SERVICE

19. Thread the plasma insulator on the leads extension

into the union fitting and tighten securely.

Refer to Figure 4-G (below) and:

20. Pull each end of the shielded inner sleeving (from the

existing leads and from the leads extension) up and
over the plasma and coolant supply insulators. Posi-
tion the 12-inch shielded inner sleeving connector
down over the completed coolant supply and plasma
connections. Secure the connector in place with a hose
clamp on each end.

Locate the hose clamps over the plasma and coolant
supply insulators to provide a solid connection. The
shielding must be continuous throughout the connection
(from the extension kit, through the connector, to the
original leads) to ensure proper shielding protection.

21. Connect the secondary and coolant return leads to the

extension kit fittings.

22. Slide the 24-inch nylon sleeving connector down to

cover all connections. Secure with electrical tape.

Figure 4-G Machine Torch Leads Extension

NOTE

Connect Coolant Return and

Secondary to

Extension Package

From

Power Supply

(Extension Kit)

From

Power Supply

(Extension Kit)

Electrical

Tape

Electrical

Tape

Plasma

Lead

Coolant Supply

Lead

12" Shielded

Inner Sleeving

24" Nylon Outer Sleeving

Secondary

Lead

Coolant Return

Lead

Locate Clamp

Over Insulators

Locate Clamp

Over Insulators

A-00963

To Torch

(Existing Leads)

To Torch

(Existing Leads)