7 routine maintenance schedule, 7 routine maintenance schedule -7 – Tweco 15XC CE Merlin PAK User Manual
Page 131
Manual 0-2529
6 - 7
ADDITIONAL INFORMATION
This recommended schedule applies to all types of liquid cooled plasma cutting systems. Some systems will
not have all the parts listed and those checks need not be performed.
NOTE
The actual frequency of
maintenance may need to be
adjusted according to the op-
erating environment.
Daily Operational Checks or Every Six Arc Hours:
1. Check torch parts, replace if damaged.
2. Check plasma and secondary supply and pressure/flow.
3. Purge plasma gas line to remove any moisture build-up.
4. Check deionizer bag/cartridge, replace if color is predominantly yellow.
5. Check coolant pressure (100 - 120 psi).
Weekly or Every 30 Arc Hours:
1. Blow or vacuum dust and dirt out of the entire machine.
Six Months or Every 720 Arc Hours:
1. Remove and clean in-line filter screens.
2. Check cables and hoses for leaks or cracks, replace if necessary.
3. Check all contactor points for severe arcing or pits, replace if necessary.
4. Check all pillow blocks and bearings, clean and lubricate if necessary.
5. Check fan, pump and pulley belts for wear or cracking, replace if necessary.
Twelve Months or Every 1500 Arc Hours:
1. Drain coolant, fill with distilled water, turn on main power switch and let machine run for approxi-
mately 30 minutes.
WARNING
DO NOT energize the
Torch.
Drain distilled water and replace with Thermal Arc Coolant. Use Standard Mix Coolant (Catalog # 7-3580) or
Super Mix Coolant (Catalog # 7-3581) for environments below +10° F (-12° C).
2. Check radiator fins, clean and comb out if necessary.
3. Repeat six month maintenance.
6.7 ROUTINE MAINTENANCE SCHEDULE