7 auxiliary connections, 7 auxiliary connections -10 – Tweco 15XC CE Merlin PAK User Manual
Page 32
![background image](/manuals/595029/32/background.png)
INSTALLATION
2 - 10
Manual 0-2529
Remote Operator Control
Panel Installation
The Remote Operator Control Panel consists of the control
panel enclosure and cables required for connection.
1. Connect the control cable to the receptacle marked
REMOTE (J15) on the rear panel.
2. Connect the other end of the control cable to the
receptacle marked PS (J37) on the remote operator
control panel enclosure.
1. Connect the interface cable to the receptacle marked
CNC (J29) on the remote operator control panel.
2. Connect the other end to the customer-supplied mo-
tion control device (refer to the CNC Interface Sche-
matic on page 6-4).
The SC-5 Standoff Control consists of a control panel, an
electronic unit, a voltage divider board, a torch lifter
motor, and cables required for installation (see Figure 2-G,
page 2-11). It is ordered and shipped separately and must
be installed according to the SC-5 Standoff Control Instruc-
tion Manual, which is included with the SC-5 unit.
Refer to the High-Flow Water Shield Instruction Manual
and:
1. Connect the high-flow starter control cable to the
receptacle marked HI-FLOW WATER SHIELD on the
power supply rear panel. The receptacle is 115VAC to
activate the high-flow water shield.
2. To shut off the high-flow water shield remove the
control cable or disconnect power to the high-flow
water shield unit.
2.7 AUXILIARY CONNECTIONS
Computer Control Interface
Installation
SC-5 Standoff Control
Installation
High-Flow Water Shield
Installation