beautypg.com

Control settings, Cleaning the control, Dip switch settings – tekmar 275 Boiler Control User Manual

Page 28: H2048b

background image

©

2012 275_D

-

11/12

28

of

48

Cleaning the Control

The control’s exterior can be cleaned using a damp cloth. Moisten the cloth with water and wring out prior to wiping control.
Do not use solvents or cleaning solutions.

DIP Switch Settings

Set the DIP switch settings prior to making adjustments
to the control through the user interface. Setting the DIP
switches determines which menu items are displayed in
the user interface.

Switch Settings

Setback

Boiler Control 275

One tN4, Four Modulating Boiler & DHW / Setpoint

Menu

Item

Test

Boiler Demand
DHW / Setpoint Demand
Proof Demand

EMS Input Signal

Priority Override

Power

115 V ±10% 60 Hz 7 VA, 1150 VA max.

Relays

230 V (ac) 5 A 1/3 hp

Demands 20 to 260 V (ac) 2 VA

Made in Canada by

tekmar Control Systems Ltd

tektra 1020-01

Meets Class B:

Canadian ICES

FCC Part 15

For maximum heat,

press and hold Test

button for 3 seconds.

not testing

testing

testing paused

off

red

red

BTC I

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Demands

Dat

e Code

H2048B

Signal wiring must be rated at least 300 V.

DHW

29

/Setp

Com

30

Dem

Pr.

31

Dem

2

5

Mod1

1

+

Mod2

3

+

+

Mod3

4

+

Mod4

6

+

BRet/

7

Com

8

tN4

12

Boil

9

Out

10

Com

11

Prim

P1

L

N

26

Power

28

27

14

13

Do not apply power

24

DHW

/ P2

23

25

16

15

18

17

20

19

22

21

Fixed Lead

First On / Last Off

First On / First Off

Relay

1

Relay

2

Relay

3

Relay

4

C.A. /
Alert

Boiler

Demand

Sup

DHW

Zone Load Shedding

EMS / Demands
The EMS / Demands DIP switch selects whether a tekmar
outdoor sensor 070 or an external 0-10 or 2-10 V (dc) input
signal is to be connected to the com - and Out+ terminals
(2 & 3).

Set the EMS / Demands DIP switch to EMS if an Energy
Management System is providing an external analog input
signal to the control.

Set the EMS / Demands DIP switch to Demands if the
control is accepting a boiler demand and using the outdoor
sensor for outdoor reset.

Setback BTC I

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Demands

Fixed Lead

First On / Last Off

First On / First Off

Lock / Unlock
Use this DIP switch to lock and unlock the Access Level
of the 275 and all connected tN4 devices, including tN4
thermostats. For details, see “Access Level”.

• Once locked, the access level in all devices cannot be
viewed or changed.

• When the control is locked, a small segment representing
a padlock is shown in the bottom right hand corner of the
display (except in View and Time Menu)

Setback BTC I

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Demands

Fixed Lead

First On / Last Off

First On / First Off

Off / Exercise
Use the Off / Exercise DIP switch to select whether or not
the control is to exercise all pumps, and hydronic zones
(zone valves and zone pumps) for 10 seconds every three
days of inactivity to prevent seizure.

Setback BTC I

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Demands

Fixed Lead

First On / Last Off

First On / First Off

Setback / Off
Use the Setback / Off DIP switch to select whether or not
the control is to follow a schedule.

If the 275 is to be a schedule member or schedule master,
set the DIP switch to Setback to enable the Time and
Schedule menus and the Unocc items in the Adjust
menu.
If the 275 does not follow a schedule, set the DIP switch
to Off to disable the Time and Schedule menus and the
Unocc items in the Adjust menu.

Setback

BTC I

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Demands

Fixed Lead

First On / Last Off

First On / First Off

Control Settings