System installation, 6 initial checkout and optical alignment procedure – Banner EZ-SCREEN­ Safety Light Curtain Systems User Manual

Page 31

background image

P/N 68413 rev. A

29

Banner Engineering Corp.

Minneapolis, U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

EZ-SCREEN Point

Instruction Manual

System Installation

Temporary Power

1.   Inspect the area near the light beam (including work pieces 

and the guarded machine) for reflective surfaces. (Reflective 

surfaces may cause light to reflect around a person in

the beam, preventing the person from being detected and 

not stopping the machine motion.) Remove the reflective 

surfaces as possible by relocating them, painting, masking or 

roughening them. Remaining problem reflections will become 

apparent during step 5 .

2.   Verify that power is removed from the EZ-SCREEN System 

and from the guarded machine. Remove all obstructions from 

the light beam. Leaving power to the guarded machine OFF, 

power up the EZ-SCREEN System. Verify that input power is 

present to both emitter and receiver. Do not operate the EZ-

SCREEN System without a proper earth ground at the

terminal on both sensors, as shown in Figures 3-18

through 3-21. At least one indicator on both emitter and

receiver should be ON.

3.   Observe the Beam Status indicator on the receiver to 

determine light grid alignment status:

A blocked condition is indicated by the Status indicator

steady Red, and the Beam Status indicator steady Red. 

A clear condition is indicated by the Beam Status indicator

steady Green. (It will flicker Green if excess gain is 

marginal.)

A latch condition is indicated by the receiver Status 

indicator steady Red . The Beam Status indicator may

be Red, Green, or flashing Green, depending on beam 

status. In Latch Output mode, the outputs come back on only 

when the beam is clear and after a manual reset.

A lockout condition is indicated by the receiver Status 

indicator single-flashing Red, and the receiver Reset 

indicator OFF.

Reset Switch Hookup

Connect the external Reset switch to the Reset terminal on the 

receiver terminal block and to 24V dc (see Figures 3-19, 3-20 

and 3-21). 

Configuring the System for Initial Checkout

Verify that the System is set to the factory presets for initial

checkout and optical alignment. (Factory presets are for Latch 

Output, 2-Channel EDM, and Scan Code 1; receiver terminals 6 

and 7 should be connected, as described in step 4 above.) See 

Figure 4-1.

3.6 Initial Checkout and Optical Alignment Procedure

Verifying System Operation

The initial checkout procedure must be performed by a Qualified 

Person (see WARNING, page 17). It must be performed only 

after configuring the System and after connecting the emitter and

receiver per Section 3.5.
The procedure is performed on two occasions:

•   To ensure proper installation when the System is first installed, 

and

•   To ensure proper System function whenever any maintenance 

or modification is performed on the System or on the

machinery being guarded by the System . (See Section 6 .1 for

a schedule of required checkouts.)

For the initial checkout, the EZ-SCREEN Point System must be 

checked without power being available to the guarded machine. 

Final interface connections to the guarded machine cannot

take place until the Point system has been checked out.
Verify that:

•   Power has been removed from (or is not available to) the 

guarded machine, its controls or actuators; and

•   The machine control circuit is not connected to the OSSD 

outputs at this time (permanent connections will be made 

following this initial checkout); and

•   EDM has been configured for No Monitoring, per Section 3.5.