beautypg.com

System installation, 4 emitter/receiver orientation, Ez-screen point – Banner EZ-SCREEN­ Safety Light Curtain Systems User Manual

Page 23

background image

P/N 68413 rev. A

21

Banner Engineering Corp.

Minneapolis, U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

EZ-SCREEN Point

Instruction Manual

System Installation

Figure 3-8. Emitter/receiver orientation

3.3.4 Emitter/Receiver Orientation

The emitter and receiver must be mounted vertically, and 

parallel to each other. Otherwise dangerous voids in the light 

grid could allow objects or personnel to pass undetected through 

the grid (see Figure 3-8). Be certain the light grid covers all

access to the guarded area not otherwise protected by hard

guarding or other supplemental guarding.

Floor

Floor

Floor

Floor

E

R

E

R

E

R

E

R

E

R

E

R

E

R

E

R

Floor

Floor

Floor

Floor

E

R

E

R

E

R

E

R

E

R

E

R

E

R

E

R

Floor

Floor

Floor

Floor

E

R

E

R

E

R

E

R

E

R

E

R

E

R

E

R

Good Orientation
emitters and receivers are parallel and 
perpendicular to floor and spaced equally from
floor

Floor

Floor

Floor

Floor

E

R

E

R

E

R

E

R

E

R

E

R

E

R

E

R

Good Orientation
emitters and receivers are parallel (but not plumb), 
perpendicular to floor and spaced equally from
floor

Unacceptable Orientation
emitters and receivers are not parallel

Unacceptable Orientation
emitters and receivers are parallel, but not 
perpendicular to floor or spaced equally from
floor. Distance from bottom beam to floor does 
not comply with applicable standards

This manual is related to the following products: