beautypg.com

STEMCO Aeris User Manual

Page 8

background image

Aeris Installation and Service Manual

Page 8 of 42






Recommended Tool List

1/2” Drill

Drill Speed Recommendations

- Drill Speed 7/16” drill…262 rpm to 786 rpm
- Drill Speed 5/16” drill…367 rpm to 1100 rpm

Drill Bushings (Type SF) 5/16”, 7/16” and 9/16”

Drill Bits 5/16”and 7/16”

A variable speed ½” drive electric drill is recommended

1/4-18 NPT Tap

L1 NPT Plug Gauge

Medium to Heavy Duty Extension Cord

Wire Strippers

Wire Crimper

Combination Wrenches – 1/2", 9/16” and 11/16”

Hammer

Drill Fixture (See page 12)

Ratchet and Sockets - 1/2", 9/16” and 11/16”

#2 Phillips Screwdriver Bit for Drill

Cutting and Tapping Fluid

10” Adjustable Wrench (Crescent)



Aeris Installation

Trailer Preparation

!

WARNING: Before starting any work on trailer, park trailer on a level surface. Chock all wheels in front
and back of each wheel to prevent the trailer from moving. Support the trailer with safety jack stands.
Do not work under vehicle supported by jack stands only! Jacks can slip and fall over. Serious personal
injury or damage to components can result. See Figure 1

!

WARNING: To prevent serious eye injury, always wear approved safety glasses when performing trailer
maintenance and service.