Chapter 3: installation, Site requirements, Unpacking the drives – ElmoMC SimplIQ Digital Servo Drives-Whistle Installation Guide User Manual
Page 16: Chapter 3, Installation, Site requirements 3.2. unpacking the drives
Whistle and Tweeter Installation Guide
MAN-WHTWIG (Ver. 1.604)
16
Chapter 3:
Installation
The Whistle and Tweeter must be installed in a suitable environment and properly connected
to its voltage supplies and the motor.
3.1. Site Requirements
You can guarantee the safe operation of the Whistle and Tweeter by ensuring that they are
installed in an appropriate environment.
Feature
Value
Ambient operating temperature
0 °C to 40 °C (32 °F to 104 °F)
Maximum relative humidity
90% non-condensing
Operating area atmosphere
No flammable gases or vapors permitted in area
Models for extended environmental conditions are available.
Caution:
The Whistle and Tweeter dissipate heat by convection. The maximum
operating ambient temperature of 0 °C to 40 °C (32 °F to 104° F) must not be
exceeded.
3.2. Unpacking the Drives
Before you begin working with the Whistle or Tweeter, verify that you have all of their
components, as follows:
•
The Whistle or Tweeter servo drives
•
The Composer software and software manual
The Whistle and Tweeter are shipped in a cardboard box with Styrofoam protection.
To unpack the Whistle and Tweeter:
1.
Carefully remove the servo drive from the box and the Styrofoam.
2.
Check the drive to ensure that there is no visible damage to the instrument. If any damage
has occurred, report it immediately to the carrier that delivered your drive.
3.
To ensure that the Whistle or Tweeter you have unpacked is the appropriate type for your
requirements, locate the part number sticker on the side of the Whistle or and Tweeter. It
looks like this: