5.1

95-8599

10

PROOF TESTING

After installation and start-up have been completed,

Proof Tests must be performed for the Det-Tronics EQP

Safety System.

Personnel performing Proof Test procedures must be

competent to perform the task. All Proof Test results

must be recorded, analyzed, and any errors in the safety

functionality must be corrected. The Proof Tests must be

performed at a frequency as shown in the following table.

WARNING

to prevent undesired actuation of alarm equipment,
systems or signaling devices, be sure to secure
these devices prior to performing the test.

WARNING

Failure to perform the specified testing and
inspection may lower or void the SIL rating for the
product or system.

EDIO INPUT ChANNEL PROOf TEST
Tools Required: None

Initiate the input channel via the connected contact

closure device. Verify correct operation at the EDIO

by the local channel LED turning red. If the input is

classified as a flame or gas device, verify correct alarm

display at the EQP controller.

EDIO OUTPUT ChANNEL PROOf TEST
Tools Required: None

Initiate the EDIO output channel by the user logic or

activate the associated input devices (EDIO input, flame

detectors, gas detectors, etc.). Verify correct operation

at the EDIO by the local channel LED turning red. Verify

that the end device connected to the EDIO channel is

activated.

AIM INPUT ChANNEL PROOf TEST
Tools Required: None

1. Bypass the safety function and take appropriate

action to avoid a false trip.

2. Retrieve any diagnostics via the EQP controller and

take appropriate action.

3. Using the connected 4-20 mA device, input a high

alarm current level to each configured channel

and verify correct operation at the AIM by the local

channel LED turning red on that channel and no

others. Verify that the correct alarm is displayed at

the EQP controller for that channel and no others.

4. Using the connected 4-20 mA device, input an

under-current level to each configured channel

and verify correct operation at the AIM by the local

channel LED turning amber on that channel and

no others. Verify that an under-current condition is

correctly displayed at the EQP controller for that

channel and no others.

5. Remove the bypass and otherwise restore normal

operation.

X3301 VISUAL fIELD INSPECTION PROOf TEST
Visual inspection of all Safety-Certified X3301

Multispectrum IR Flame Detectors shall be conducted

weekly to confirm that there are no obstructions in

the optical field of view. Corrective action will include

removal of such impediments should they exist.

Proof Test Name

Commissioning

frequency per Year

EDIO Input Channel Proof Test

Yes

1

EDIO Output Channel Proof Test

Yes

1

AIM Input Channel Proof Test

Yes

1

X3301 Visual Field Inspection Proof Test

Yes

As needed, depending on level and

type of contaminants present

X3301 Mag oi Proof Test

Yes

1

PIRECL Visual Field Inspection Proof Test

Yes

As needed, depending on level and

type of contaminants present

PIRECL Gas Response Proof Test

Yes

1

EQP User Logic Verification

Yes