beautypg.com

Burnham MPC User Manual

Page 59

background image

59

Figure 9a: Recommended MPC Minimum Piping - Single Boiler Application

NOTES:

1. All piping is schedule 40.

2. Pipe sizes listed are based on a 20°F

or 40°F Delta T (temperature rise
across the boiler).

Select one to match application.

3. When specified supply/return piping

size is less than 4”, install appropriate
size reducer directly onto boiler supply
and return manifolds.

4. Drain valve - ball valve preferable,

gate valve acceptable alternative
(supplied by others). Minimum valve
size per ASME Code is 3/4” NPT.

5. Swing joints may be piped over the top

of the boiler if space is limited.

6. System design must accommodate the

above Boiler Operating Requirements.

7. Diaphragm expansion tank shown, but

other types of air elimination systems
may be used.

Boiler

Model

Supply / Return

20°F Rise

40°F Rise

Nom. I.D.

(Inch)

Water Side

Press. Drop

(Ft/Wtr)

Flow
Rate

(GPM)

Nom. I.D.

(Inch)

Water Side

Press. Drop

(Ft/Wtr)

Flow
Rate

(GPM)

MPC4

2

1.9

42.4

0.9

21.2

MPC5

2

2.6

65.2

1.6

32.6

MPC6

2

3.3

83.7

2.3

41.9

MPC7

4.0

102.3

3.0

51.2

MPC8

4.7

120.9

2

3.7

60.5

MPC9

3

5.4

139.6

2

4.4

69.8

MPC10

3

6.1

158.1

2

5.1

79.0

MPC11

3

6.8

176.7

2

5.8

88.3

MPC12

3

7.5

195.2

6.4

97.6

MPC13

4

8.2

213.8

7.1

106.9

MPC14

4

8.9

232.3

7.8

116.1

MPC15

4

9.6

250.9

8.5

125.5

MPC16

4

10.3

269.5

3

9.2

134.8

MPC17

4

11.0

288.1

3

9.9

144.1

MPC18

4

11.7

306.6

3

10.6

153.3

1

Boiler Operating Requirements:

• Minimum Return Water Temperature = 80°f

• Maximum Delta T = 80°f

• Minimum supply Water Temperature = 130°f

This manual is related to the following products: